Plan your next campaign
UGC delivery and revisions: from approved brief to final files
By UseHype · Brand campaign guides
A useful UGC timeline starts with the dependencies: product access, approved facts, available talent and a person who can approve the work. Agree on dates for those inputs before promising a final delivery date.

Updated
Browse creator portfolios · Create a brand account
Define what arrives at handoff
List quantities, aspect ratios, target durations, captioned and clean versions, and any thumbnails or stills. If you want three openings for one video, say whether the creator should deliver three complete exports or separate opening clips. Those are different editing jobs.
Make a simple delivery table in the brief: asset name, format, purpose and acceptance criteria. Use filenames that distinguish versions. “Bottle-demo-hook-A-captioned-v2” is easier to track than several files all called “final”.
Build the schedule around product access
For a physical product, confirm the shipping address privately, dispatch responsibility, expected arrival and what happens if the item is damaged. Include time for the creator to use it honestly if the brief involves personal experience. A testimonial cannot be scheduled before that experience exists.
For software, supply a working demo account, sample data and the approved feature list. For a venue, confirm access, opening hours, permissions and weather or noise constraints. Start the production clock from the agreed ready-to-film milestone.
Approve the expensive decisions early
Review the concept, claims and shot list before filming where the project needs it. Identify anything difficult to reshoot: travel, food preparation, packaging seals or a hired location. A short written confirmation can prevent an avoidable second production day.
Agree what a revision includes. A caption correction, a different music track and a completely new concept require different work. Define included rounds and how additional work is quoted. Do not import another platform’s review window into your agreement.
Give timecoded feedback against the brief
Choose one person to collect comments. Link the feedback to the agreed requirement: “At 00:07, the cap is outside the frame; show the opening action” is actionable. “Make it more premium” leaves the creator guessing. Distinguish a correction from an optional preference.
When reviewers disagree, resolve it internally before sending another round. If you change a product claim or offer after the approved draft, check whether the creator needs more time or a revised fee. Record the accepted change alongside the version.
Check the final export and close the loop
Review the downloaded file, not only a messaging-app preview. Check picture, audio, captions, spelling, required shots, private information and the call to action. Confirm that usage permission and any music or appearance clearances cover the intended publication.
Keep the final approval and agreed payment milestones in the project record. Save the usable files in your asset library with their rights information. After launch, share factual feedback with the creator; distinguish measured campaign results from subjective reactions.




